The Bergwerksteg footbridge spans the River Jagst in the town of Crailsheim. The Novara ST II balustrade provides decorative safety fencing for the bridge, making it a real eye-catcher.
|
Realisation Winter 2014 |
|
|
Execution 102 m of Novara ST infill railing, comprising steel tubular posts (Ø 89 mm), with mounting feet for lateral attachment to the bridge structure, parapet height 1,300 mm, a perimeter frame with infill, material thickness 12 mm and 8 mm, featuring a curved section and a finial, post spacing approx. 2.00 m, handrail, diameter 42 mm, all steel components hot-dip galvanised, 2K epoxy-based paint finish, colour: DB 703, delivery to the building site only, excluding installation |
|
|
Address Bergwerkstraße, 74564 Crailsheim |