The Bergwerksteg footbridge spans the River Jagst in the town of Crailsheim. The Novara ST II balustrade provides decorative safety fencing for the bridge, making it a real eye-catcher.

Realisation
Winter 2014
Execution

102 m of Novara ST infill railing, comprising steel tubular posts (Ø 89 mm), with mounting feet for lateral attachment to the bridge structure, parapet height 1,300 mm, a perimeter frame with infill, material thickness 12 mm and 8 mm, featuring a curved section and a finial, post spacing approx. 2.00 m,

handrail, diameter 42 mm,

all steel components hot-dip galvanised, 2K epoxy-based paint finish, colour: DB 703, delivery to the building site only, excluding installation

Address
Bergwerkstraße, 74564 Crailsheim