At the Neuer Graben 39 in Osnabrück, a good 15 m of trip railings from the Münster system were installed as a circular bed border with a diameter of 5 m.
Project participants |
|
Realisation May/June 2017 |
|
Execution 15 running meters of the trip rail system Münster |
|
Address Neuer Graben 39, 49074 Osnabrück |