The Girona supply bollard for the electricity and water supply was installed outside the Holtzbrinck Castle meeting centre. It blends harmoniously into the overall picture.
Realisation | Summer 2019 |
---|---|
Execution | 1 supply bollard type Girona, equipped with electricity and water, RAL 7016 |
Address | Kirchstaße 20, 58762 Altena |
Plan route